Description |
1 online resource (197 pages) |
Contents |
""The Engineer�s Manual of Construction Site Planning""; ""Copyright""; ""Contents""; ""List of Figures""; ""List of Tables""; ""About the Authors""; ""Preface""; ""Introduction""; ""Chapter 1 Initial data""; ""1.1 The project (design) documentation""; ""1.2 The bill of quantities and the bill of activities""; ""1.3 Job descriptions and specifications""; ""1.4 The contract conditions set out in the bidding invitation documents""; ""1.5 The report of the construction site inspection""; ""Chapter 2 Outline of site management planning in the bidding stage""; ""2.1 The goal"" |
|
""2.2 The explanatory note""""2.3 Construction site layout""; ""2.4 The construction time schedule""; ""2.5 Cost estimation of temporary works and construction site set-up""; ""Chapter 3 Outline of site management after contract signature""; ""3.1 The goal""; ""3.2 Initial data""; ""3.3 Construction site layout""; ""3.4 Construction scheduling""; ""3.5 Calculation of site work quantities and estimate of costs""; ""Chapter 4 Suggestions for choosing construction cranes""; ""4.1 General""; ""4.2 Selection and positioning of tower cranes""; ""4.2.1 Selection of tower cranes"" |
|
""4.2.2 Positioning the crane""""4.2.3 Crane impact areas""; ""4.2.4 Using several tower cranes simultaneously""; ""4.3 Selection and impact areas of mobile cranes""; ""4.3.1 Selection of mobile crane""; ""4.3.2 Work of the mobile crane by a recess""; ""4.3.3 Mobile crane impact range""; ""4.4 Cranes working near overhead power lines""; ""4.5 Hoist danger area""; ""4.6 Operating cranes near buildings in use""; ""4.7 Restrictions on crane work""; ""4.8 Working in the danger area""; ""Chapter 5 Suggestions for calculating resource requirements""; ""5.1 Construction site temporary roads"" |
|
""5.2 Construction site storage""""5.2.1 General principles""; ""5.2.2 Determining the storage space allocation""; ""5.2.3 Selection of storage locations""; ""5.3 Temporary buildings""; ""5.4 Temporary water supply""; ""5.5 Temporary heating supply""; ""5.5.1 General principles""; ""5.5.2 Calculation of heat energy requirements""; ""5.5.3 Sources of temporary heating supply""; ""5.6 Temporary power supply""; ""5.6.1 General principles""; ""5.6.2 Calculation of electricity load requirement""; ""5.7 Construction site lighting""; ""5.8 Construction site transport""; ""5.8.1 General principles"" |
|
""5.8.2 Calculation of vehicles allocation for car transport""""5.9 Load take up devices""; ""5.10 Construction site fencing""; ""Chapter 6 On-site safety requirements""; ""6.1 General basics and responsibilities""; ""6.2 The duties of building contractors""; ""6.3 The obligations and rights of the labourer""; ""6.4 Ensuring safety on the construction site""; ""6.4.1 General""; ""6.4.2 Safety requirements in a work zone""; ""6.4.3 Special requirements for assembly works""; ""6.4.4 Special requirements for work in pits, wells, in tunnels and earthworks and underground"" |
Notes |
""6.4.5 Special requirements for working at height and on roofs"" |
|
Print version record |
Subject |
Building sites -- Planning -- Handbooks, manuals, etc
|
|
Building -- Superintendence -- Handbooks, manuals, etc
|
|
Civil engineering -- Handbooks, manuals, etc
|
|
Building sites -- Planning
|
|
Building -- Superintendence
|
|
Civil engineering
|
Genre/Form |
Handbooks and manuals
|
Form |
Electronic book
|
Author |
Lill, Irene
|
|
Müürsepp, Olev
|
ISBN |
9781118556085 |
|
1118556089 |
|