Limit search to available items
Book Cover
E-book

Title AIChE equipment testing procedure. Trayed & packed columns : a guide to performance evaluation / prepared by the Equipment Testing Procedures Committee of the American Institute of Chemical Engineers
Edition Third edition
Published Hoboken, New Jersey : Wiley-AIChE, 2014

Copies

Description 1 online resource
Contents Purpose & scope -- Definition and description of terms -- Test planning -- Methods of measurement and sampling -- Test procedure -- Computation results -- Interpretation of results -- Appendix
100.0 PURPOSE & SCOPE -- 101.0 Purpose -- 102.0 Scope -- 200.0 DEFINITION AND DESCRIPTION OF TERMS -- 201.0 Flow Quantities -- 202.0 Key Components -- 203.0 Mass Transfer Efficiency -- 203.1 Theoretical Trays or Plates or Stages -- 203.2 Overall Column Efficiency -- 203.3 Apparent Murphree Tray Efficiency -- 203.4 Ideal Murphree Tray Efficiency -- 203.5 Murphree Point Efficiency -- 203.6 HETP -- 203.7 HTU -- 203.8 NTU -- 204.0 Operating Lines -- 205.0 Pinch -- 206.0 Maximum Throughput -- 206.1 Maximum Hydraulic Throughput -- 206.2 Maximum Operational Capacity206.3 Maximum Efficient Capacity -- 207.0 Minimum Operating Rate -- 208.0 Operating Section -- 209.0 Hardware -- 209.1 Components of a Trayed Column -- 209.2 Components of a Packed Column -- 300.0 TEST PLANNING -- 301.0 Preliminary Preparation -- 301.1 Safety -- 301.2 Environmental Considerations -- 301.3 Test Objectives -- 301.4 Organizational Resources -- 301.5 Schedule -- 301.6 Review of Historic Operating Data -- 302.0 Column Control and Instrumentation -- 303.0 Peripheral Equipment -- 304.0 Pre-test Calculations -- 304.1 Process Simulation -- 304.2 Dry Run -- 305.0 Types of Tests -- 305.1 Performance Tests305.2 Acceptance Tests -- 306.0 Specific Areas of lnterest -- 306.1 Packing Efficiencies -- 306.2 Tray Efficiencies -- 306.3 Overall Column Efficiency -- 306.4 Capacity Limitations -- 307.0 Energy Consumption -- 308.0 Pressure Drop Restrictions -- 309.0 Data Collection Requirements -- 309.1 Process Operating Data -- 309.2 Gamma Scan Data -- 310.0 Conditions of External Streams -- 310.1 Overall and Component Material Balances -- 310.2 Overall Enthalpy Balances -- 311.0 Internal Temperatures -- 311.1 Heat Balances -- 311.2 Internal Profiles -- 312.0 Internal Samples -- 312.1 Internal Samples for Efficiency Checks -- 312.2 Internal Samples for Overall Performance -- 313.0 Pressure Profiles -- 314.0 Data Requirements-Physical Properties -- 314.1 Test Mixtures -- 314.2 Essential Data -- 315.0 Auxiliary Data -- 316.0 Test Procedure Documentation -- 400.0 METHODS OF MEASUREMENT AND SAMPLING -- 401.0 System Controls and Operating Stability -- 402.0 Measurement of Temperatures -- 402.1 Accuracy -- 402.2 Errors -- 403.0 Measurement of Flow Rates -- 403.1 Orifice Meters -- 403.2 Rotameters -- 403.3 Vortex Flow Meters -- 403.4 Coriolis Flow Meters -- 403.5 Magnetic Flow Meters -- 403.6 Pitot Tube (or Annubar) -- 403.7 Direct Volume or Weight Measurement -- 404.0 Measurement of Column Pressure Drop -- 404.1 Instrument -- 404.2 Pressure Taps -- 404.3 Seal Pots -- 404.4 Leakage Check -- 404.5 Accuracy -- 405.0 Sampling Procedure -- 405.1 General -- 405.2 Selection of Sampling Points -- 405.3 Sample Connections -- 405.4 Containers -- 405.5 Sampling of High Boiling Materials -- 405.6 Sampling of Intermediate Boiling Materials -- 405.7 Sampling of Materials Having Boiling Points Below -50° F ( -46°C) -- 405.8 Leakage Check -- 405.9 Labeling and Handling the Samples -- 500.0 TEST PROCEDURE -- 501.0 Preliminary -- 502.0 Test Procedure for Maximum Hydraulic Throughput -- 502.1 Flood Symptoms -- 502.2 Performing Capacity Tests -- 502.3 Operational Test Technique -- Gamma Scanning -- 503.0 Considerations Affecting Efficiency Test Procedure -- 503.0 Considerations Affecting Efficiency Test Procedure -- 503.1 Rigorous Versus Shortcut Efficiency Tests -- 503.2 Strategy of Efficiency Testing -- 503.3 Early Preparation for Efficiency Tests -- 503.4 Last-minute Preparations for Efficiency Tests -- 503.5 Establishment of Steady State Conditions -- 503.6 The Test Day -- 503.7 Concluding Test -- 600.0 COMPUTATION OF RESULTS -- 601.0 Verification of Test Data and Simulation Models -- 602.0 Material Balance -- 602.1 End Effects -- 603.0 Enthalpy Balance -- 603.1 Overall Balance -- 603.2 Internal Flow Rates -- 604.0 Hydraulic Performance -- 604.1 Trayed Column -- 604.2 Packed Column -- 605.0 Efficiency Performance -- 605.1 Trayed Column -- 605.2 Packed Column -- 700.0 INTERPRETATION OF RESULTS -- 701.0 Sources of Experimental Error -- 701.1 Material and Enthalpy Balances -- 702.0 Effects of Experimental Error -- 703.0 Design versus Performance -- 703.1 Mechanical/Tower Equipment -- 703.2 Process Conditions -- 704.0 Hydraulic Performance -- 704.1 Mechanical/Tower Equipment -- 704.2 Tray -- 704.3 Packing -- 704.4 Process Conditions -- 705.0 Mass Transfer Performance -- 705.1 Mechanical/Tower Equipment -- 705.2 Tray -- 705.3 Packing -- 705.4 Maldistribution -- 705.5 Process -- 706.0 Test Troubleshooting -- 706.1 Analysis Procedure -- 706.2 Sampling -- 706.3 Equilibrium Data -- 706.4 Temperature Measurements -- 706.5 Heat and Material Balances -- 706.6 Fluctuation of Process Conditions -- 706.7 Pressure Drop Measurements -- 706.8 Incorrect Prediction of Pressure Drop -- 706.9 Errors in Assumptions in Modeling Mass Transfer -- 706.10 Multicomponent Systems Deviate from Binary Data -- 706.11 High Purity Separation -- 706.12 Test and Design Conditions -- 800.0 APPENDIX -- 801.0 Notation -- 801.1 Greek Symbols -- 802.0 Sample Calculations -- 802.1 General Analysis of Test Data -- 802.2 Packed Column -- 802.3 Trayed Column -- 803.0 References
Summary "Provides a cost-effective and reliable reference for improving the performance of new and existing process equipment Step-by-step procedures are flexible enough to be applied in a number of industrial applications "-- Provided by publisher
Notes Includes index
Bibliography Includes bibliographical references and index
Notes Print version record and CIP data provided by publisher
Subject Plate towers -- Evaluation
Plate towers -- Testing
TECHNOLOGY & ENGINEERING -- Chemical & Biochemical.
Form Electronic book
Author American Institute of Chemical Engineers. Equipment Testing Procedures Committee.
LC no. 2014003278
ISBN 9781118860182
1118860187
9781118860540
1118860543
9781118860373
1118860373
9781118860250
111886025X
1118627717
9781118627716
9781523109937
1523109939
Other Titles Trayed & packed columns
Trayed and packed columns