"To measure large-scale bank erosion in the Ngarradj catchment, in which the Jabiluka mine is located, 56 permanently marked channel cross sections were installed in 1998 on the mine site tributaries (Tributaries North and Central) and at the three Environmental Research Institute of the Supervising Scientist (eriss) gauging stations. The sections have been resurveyed annually during the dry season and the results to 2003 are analysed in this report. To measure scour and fill of the sand-bed streams, 30 scour chains were used at some of the above cross sections. They were installed progressively during the 1998 and 1999 dry seasons and have been measured annually during successive dry seasons. The results to 2003 are also analysed in this report. The period between 1998 and 2003 was characterised by average to above average rainfall."--P. xi
Notes
ANALYTIC
Bibliography
Bibliography: pages 65-68
Notes
Also available via the World Wide Web
System requirements: Internet connectivity, World Wide Web browser, Adobe Acrobat reader